Open_House_Poster_151112_640x900.jpg

Open House 11/12/2015: Tolt Ave CBD Improvement Project Design Concepts

You’re Invited to Review Design Concepts and Options for the Tolt Avenue CBD Project!

Come and see the design ideas emerging from the project team’s work on the Tolt Avenue CBD Improvements Project, focused on the Central Business District corridor from Rutherford Street to Eugene Street. Otak, the project engineering team, has been working with a Community Advisory Committee for several months developing design concepts for the corridor. Before the project moves forward into preliminary engineering, the team will gather input from the public at the November 12, 2015 open house. Please stop by the Council Chambers at City Hall at anytime between 6:00 pm and 8:00 pm to view displays, talk with the design team, and provide your comments and input.

General Project Description:

Tolt Avenue CBD improvements are anticipated to include street, sidewalk, and utility reconstruction for approximately 1,350 linear feet of Tolt Avenue between East Eugene Street and East Rutherford Street.

Key Project Elements:

•Street grading and paving
•Curb and gutter improvements
•Sidewalk and pedestrian shared-use walkways
•Streetscape and site furnishings
•Street signing and pavement markings
•Storm drainage infrastructure improvements
•Undergrounding of existing overhead utility lines
•Street and pedestrian illumination
•WSDOT channelization plan approval