You may have noticed some alley and street improvements throughout the City of Carnation since January. Our CED Utility Manager reached out to Benjamin Asphalt, a local asphalting company that resides in Carnation, to conduct some alley maintenance. Throughout the past 5 months, many other developments in addition to alley work have taken place.
The following enhancements took place from January – June 2023 thanks to the hard work of the people who make up Benjamin Asphalt and our CED Utility team. We sincerely thank the City Council for approving these projects.
- Alley Grading:
Every single alley in the City – with the exception of Alley D – was graded and leveled.
- Alley Paving:
Alley J, behind Red Pepper Pizza, is currently in the process of getting paved.
- Street Grading:
Bagwell Street, West Commercial Street, and NE 47th Street were graded and leveled.
- Parking Lot Paving:
The parking lots at Nick Loutsis Park and Valley Memorial Park have been paved.
- Sports Court Paving:
The basketball court at Valley Memorial Park has been paved and striped. Look forward to hoops and a fence being installed in the coming weeks.
- Shoulder Maintenance:
Shoulder work was conducted on East Reitze Street, West Rutherford Street, and East Bird Street.
- Street Paving:
A section of Stossel Street by Hockert Park and Tolt Commons will be paved next week. Stay tuned for dates and times. This is in addition to a new storm drain that was installed.
- Potholes:
Potholes were fixed and paved around water valves throughout the City.
- Valve Maintenance:
Water and sewer valves have been exercised throughout the City.
- Storm Catch Basin Maintenance:
A Vactor Trailer cleaned out the storm drains throughout the City.
- Water Meter Box Repairs
Cleaning, raising, and fixing meter boxes throughout the City is scheduled in June.